PACKET 7 15 2025 website 2
City Council · packet · 131 pages · Descriptive metadata inferred from filename
Extracted text for page 17
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item VIII. B. Approve Proposal from Gresh am Smith Engineers to Design and Prepare Construction Drawings to Connect View Street. Overview The city recently acquired a 0.13-acre strip of land as right-of-way to connect the two sides of View Street in preparation of connecting and paving this city street as a through street . The approved FY 2025- 26 Capital Improvement Fund budget contains $305,000 to design, prepare construction drawings, bid out, and construct this project. Gresham Smith Engineers has submitted a proposal for this project (attached). After the construction drawings are completed, they will be bid out, the bid awarded by City Council, and construction will begin. Estimated completion time is Spring 2026. A memo from the Public Works Department with additional details is also attached. Following discussion during the July 7, 2025 work session, the consensus was to place this item on the July 15, 2025 regular session consent agenda for approval. Action to Consider Motion, second, and majority vote are needed to approve the proposal from Gresham Smith Engineers to design and prepare construction drawings to connect View Street. Affected Departments Public Works 14