2022 09 22 City Council
City Council · packet · 85 pages · Descriptive metadata inferred from filename
Extracted text for page 35
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS TO: C. Seth Sumner, City Manager FROM: Kevin L. Helms, Project Manager Cc: Ben Burchfield, Public Works Director Brandon Ainsworth, Fire Chief DATE: September 7, 2022 SUBJECT: Request to Amend Contract Amount for Fire Tower Construction BACKGROUND In the original bid documents for the Fire Tower Construction, we included lump sum costs for excavation, fill material, and electrical wiring. However, we did not include a general contingency line item in the contract as we do with most projects which are handled under one umbrella contract as opposed to this project which has been developed in phases. Similarly, to other projects there are some additional items that need to be addressed now that we have begun construction of th e foundation and received the tower. Because of this being a prefabricated building, we anticipate less changes moving forward than with a traditional construction project. However, we would like to request a contingency allotment to cover the current items we need to address and any future items which may arise during this phase of the project. Contingency budgets generally range from 10% to 15% of the project cost. In this case we are requesting a total of $4 0,000, which is approximately 12.5% of the budget . We currently have received a change order which we requested to upgrade the electrical service for the tower. This change order is for $17,057.36. The original scope only provided electrical for the items being shipped with the tower package and after discussion with the manufacture r and other departments we believe the addition of lighting would enhance safety and security. This change order would add these services, as well as provide extra capacity should we decide something needs to be added in the future. We also had to utiliz e the lump sum clause from the bid package to bring in fill material for the foundation. The cost for this work is approximately $980. With both items added to the project, roughly 45% of the contingency will already be allocated. ACTION ITEM Approve an amendment to the Fire Tower Installation contract with Wilson Construction to include a total of $40,000 of contingency funding. 33