PUBLIC WORKS TO: C. Seth Sumner, City Manager FROM: Kevin L. Helms, Project Manager Cc: Ben Burchfield, Public Works Director Brandon Ainsworth, Fire Chief DATE: September 7, 2022 SUBJECT: Request to Proceed to Bidding Phase II of the Public Safety Training Facility BACKGROUND Included in your packet is a copy of the design plans which have been developed by Stantec for the Fire Training Facility. These documents include plans for the full development of the Fire Training Tower and the Driver Training Pad. However, they are broken into a base bid package and multiple alternates so that a decision on moving forward can be made once actual construction costs are available. This will give the City several options in regard to how much o f the project should be included in Phase II. The training room will be in a future phase of the project and certain alternate bid items could be included in that phase or a separate phase of the project at some point in the future. ACTION ITEM While there may be some minor changes needed to the project documents prior to bidding, the design provided is substantially representative of the final plans to be bid. Therefore, we are requesting approval to move forward with bidding of the Public Safety Train ing Facility. Once bids have been opened and a low and best bidder determined, a contract will be brought back before City Council for approval. 31