2025 9 16 Regular Session Packet
City Council · packet · 102 pages · Descriptive metadata inferred from filename
Extracted text for page 59
Unverified text extraction. Check the original page for numbers, names, and layout.
BASE BID Unit Price Total Price Unit Price Total Price 1 Mobilization LS 1 $112,166.00 $112,166.00 $177,368.62 $177,368.62 2 Traffic Control LS 1 $2,687.00 $2,687.00 $8,382.26 $8,382.26 3 Erosion Control LS 1 $4,246.00 $4,246.00 $33,529.04 $33,529.04 4 Landscaping LS 1 $146,920.00 $146,920.00 $150,880.68 $150,880.68 5 Unclassified Excavation CY 11,400 $45.93 $523,602.00 $22.06 $251,484.00 6 Rock Excavation CY 1,200 $45.00 $54,000.00 $111.76 $134,112.00 7 Sanitary Pipe Removal LF 100 $43.00 $4,300.00 $134.12 $13,412.00 8 Flowable Fill CY 3 $537.00 $1,611.00 $419.11 $1,257.33 9 8" Sanitary Sewer Pipe LF 423 $81.83 $34,614.09 $158.53 $67,058.19 10 Manhole EA 2 $5,107.00 $10,214.00 $10,477.83 $20,955.66 11 RCP Pipe Culvert, 36" LF 34 $296.00 $10,064.00 $197.23 $6,705.82 12 Concrete Headwall, 36" EA 2 $3,762.00 $7,524.00 $5,029.36 $10,058.72 13 Seeding AC 3.3 $2,687.00 $8,867.10 $4,064.13 $13,411.63 14 Vegetated Gabions CY 330 $525.00 $173,250.00 $708.68 $233,864.40 15 Compacted Backfill CY 500 $30.00 $15,000.00 $167.65 $83,825.00 16 Geotextile Fabric SY 600 $4.00 $2,400.00 $2.51 $1,506.00 17 Rip Rap CY 1,800 $62.30 $112,140.00 $83.82 $150,876.00 18 Permeable Pavers SF 13,200 $14.24 $187,968.00 $15.24 $201,168.00 19 Ribbon Curb LF 2,900 $23.00 $66,700.00 $28.90 $83,810.00 20 Aggregate Base Course CY 400 $78.00 $31,200.00 $73.34 $29,336.00 21 ADA Tiles SF 26 $60.00 $1,560.00 $32.24 $838.24 22 Concrete Sidewalk SF 93 $40.00 $3,720.00 $27.04 $2,514.72 $1,514,753.19 $1,676,354.31 Unit Price Total Price Unit Price Total Price 1 Mobilization LS 1 $13,000.00 $13,000.00 $169,900.37 $169,900.37 2 Traffic Control LS 1 $5,913.00 $5,913.00 $3,398.01 $3,398.01 3 Erosion Control LS 1 $4,289.00 $4,289.00 $47,572.10 $47,572.10 4 Unclassified Excavation CY 1,200 $19.00 $22,800.00 $67.96 $81,552.00 5 Hydraulic Dredging CY 4,500 $38.00 $171,000.00 $65.32 $293,940.00 6 Alternative Sediment Device EA 1 $53,000.00 $53,000.00 $47,572.10 $47,572.10 7 Seeding AC 1.8 $2,687.00 $4,836.60 $3,775.56 $6,796.01 Part B - Regional Park Dredging and Stabilizaton Units Qty Wilson Construction Part A - Mayfield Regional Detention Bid Results Various Stormwater Improvements RFB 25-13 Bid Opening Date: September 10, 2025 Athens, TN Wilamut Construction Item No. Item Description Units Qty Wilson Construction Wilamut Construction Item No. Item Description 1 of 3 9-12-25 51