2025 9 16 Regular Session Packet
City Council · packet · 102 pages · Descriptive metadata inferred from filename
Extracted text for page 57
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item XI. E. RFB 25-13: Bid Award for ARP Stormwater Grant Construction Project Overview The FY 2025-26 Capital Improvement Fund approved budget contains $2,076,000 for the construction portion of the overall ARP grant funds. Specifically, the construction portion of the grant consists of purchasing the Mayfield property ($135,000) that was previously purchased, constructing a regional detention pond on the Mayfield property, dredging and stabilizing the upper small pond at the Regional Park entrance, improving the pond on Cook Drive, and constructing an overlook and pavilion on the Mayfield property. Bid documents were prepared and distributed. On the bid deadline date of Sept. 10, 2025, two bids were received. The low bidder was Wilson Construction with the low bid of $2,031,554.99. Once the property purchase of $135,000 is added, the total construction cost is $2,166,554.99 or $90,554.99 above the budget estimate. The overage will come from the Capital Improvement Fund. There is no contingency amount in this unit priced project but will be paid out on actual quantities used which may be higher or lower than the estimated quantities. TDEC must concur with this bid award. Since this project must be completed by September 30, 2026, time is of the essence. Attached is Gresham Smith Engineer’s recommendation and bid tally sheet. Action to Consider A motion, second, and majority vote are needed to approve the bid award for RFB 25-13. Affected Departments Public Works 49