2024 12 17 Packet website
City Council · packet · 165 pages · Descriptive metadata inferred from filename
Extracted text for page 25
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item ATHENS CITY COUNCIL REGULAR SESSION Tuesday, December 17, 2024 VIII c. Approve Obtaining an Appraisal of Downtown Building to be Used as a City Hall Overview City Hall conditions, capacity, renovations, expansions, ADA compliance, and replacement construction have all been discussed for some time. During 2021, Allen & Hoshall prepared a survey of existing city hall conditions, renovation/expansion possibilities including reconfiguring recommendations with an updated floor plan, and cost estimates (report attached). However, no action was taken regarding this report. In looking toward the future and predicting the city's population will remain stable with minimal increases, the city needs to determine if the existing city hall should be renovated and/or expanded to retain most city departments, or an existing building acquired and renovated into a city hall, or a new city hall designed and constructed. The three options are explored as follows: Renovate/Expand Existing City Hall The existing 22,000 square foot city hall could be renovated/expanded into a more usable space and most departments kept within the building or at least on the city hall property campus. For example, Parks & Recreation could be relocated to a city-owned house at Regional Park to be closer to their maintenance staff to free up space needed for the remaining city hall offices. The house at Regional Park would need some renovations, however. Allen & Hoshall could be retained again to continue their city hall work from 2021 to prepare a revised space needs study of all departments except Parks & Recreation resulting in a revised floor plan and possibly new buildings on the existing city hall property campus. Then construction drawings could be prepared including HVAC replacement, code compliance issues, and needed IT infrastructure improvements such as an expanded data center, upgraded wiring, and council chambers audio/video enhancements that have been on hold for several years until a final decision can be made. Then, the project could be bid out, a general contractor selected, and construction could begin. The estimated cost of this option would be $3-4M using partially borrowed funds (debt) and take about 12+ months to complete. Acquire an Existing Building and Renovate A downtown building is available to evaluate as a possible replacement for city hall. According to the Tennessee Property Assessment Data card, this property generally consists of 3+ acres ofland with paved parking and greenspace, a two-story building built during 1966 and expanded/renovated during 1976 with the main floor having 13,440 square feet and the basement having 13,440 square feet for a total of 26,880 square feet. In addition, the facility has drive through lanes, many interior perimeter offices on both levels, and new HVAC units. The land is valued at $163,700 and the building is valued at $1,907,000 for a total value of$2,070,700. This property last sold during June 2018 for $500,000. If the council is interested in acquiring this property to be used as a city hall, many things would need to be considered including obtaining an appraisal of the property to determine current fair market value, conducting an engineering assessment to determine current conditions of all building 22