2024 12 17 Packet website
City Council · packet · 165 pages · Descriptive metadata inferred from filename
Extracted text for page 160
Machine-read OCR text; verify every number, name, and layout against the original page.
Responsible | No. Program/Cost/Funding Source Pa Status _Public Works (continued) Prepare next round of local street paving set for | Public Works 2026, $2,000,000 using local funds. Director | Prepare an electronic inventory/data base of | Public Works | Gresham Smith Engineers is major city storm water assets of location, size, Director collecting data. Plan expected to be and condition to determine stormwater needs. completed mid-2025. Then design, Then design and _ construct needed bid, award, and construct projects. improvements, $2,371,903 using ARPA grant Must be completed by Sept. 2026 funds (85% grant/15% local). This study is a precursor to creating a storm water utility. Update MS4 stormwater ordinance/permit for | Public Works | Updating ordinance. Expected compliance. Director completion during early 2025. Improve/stabilize/realign N. Jackson St. in front | Public Works | Gresham Smith Engineers has of city hall, $55,000 for engineering costs. Director conducted geotechnical analysis, preliminary design plans, and construction cost estimates. Will be discussed during 2025 strategic summit. | Prepare a lease agreement between the city and | Public Works | Lease agreement being prepared for Humane Society for them to pay for Director consideration. construction cost of their area of the new animal shelter and operating cost. Complete the last 2,000 feet of sidewalk | Public Works | Expected completion during spring construction around MCHS. | Director 2025. Sanitation Fund | Purchase routing software/hardware for garbage | Public Works | Council consented to purchasing | trucks, $44,948 over three years. Director this item during Dec. 9, 2024 work session. Other Projects | Evaluate/obtain estimated cost to install | City Manager | Obtaining costs. fencing/lighting around city hall parking areas. Value of All Projects: $8.88M Long Range Projects Program Pal Update/modernize the entire city charter in a comprehensive manner. Develop a comprehensive master plan that ties all existing single plans together with a 5-year work program. 157