2024 12 17 Packet website
City Council · packet · 165 pages · Descriptive metadata inferred from filename
Extracted text for page 159
Machine-read OCR text; verify every number, name, and layout against the original page.
Program/Cost/Funding Source Public Works | R esponsible Party Purchase bucket truck, $90,000 from Fleet | Management Fund. Purchase replacement leaf vacuum, $85,000 Public Works Director Completed. Public Works Director : from Fleet Management Fund. Install updated speed limit signs on Inglewood Ave. Public Works Director Design and implement a traffic signal retiming plan & control equipment, $62,000. Purchase 2 snowplows, $20,000. Public Works Director Completed. Acquiring an engineer. Public Works Director Purchase portable welder, $8,500. Purchase four additional post jack lifts for Fleet Maintenance, $14,000. Complete installation of fencing for dog runs at new animal shelter. Conduct grand opening ceremony for the animal shelter during Spring 2025. Improve downtown five points intersection including sidewalks, pedestrian crossings, retiming of traffic signals for pedestrian safety, $750,000 using TDOT MMAG grant (90% state/10% local). Prepare a traffic safety action plan to identify problematic and unsafe traffic areas, $105,000 using a federal Safe Streets for All (SS4A) Grant (80%, grant/20% local). Public Works Director Public Works Director Public Works | Under construction. Completion Director during Jan. 2025. Public Works Director Public Works | A RFQ was_ prepared for Director engineering services, responses due late Dec., council approval of engineer during early 2025. Then design and construction. Construction is expected to begin in 2026 and be completed in 2027. Kimly Horn has collected data. Expected completion of plan is early 2025. Once plan is completed, grant can be prepared/submitted for construction Resurface 9 city streets totaling 3.94 miles, $1,370,000 using Surface Transportation Block Grant Local (STBG-L) funds. e Mt. Verd Rd. from Clearwater Rd to city limits (.34) ® Sharp Rd. from Velma Rd. to Railroad Ave (.21) e Tellico Ave. from Congress to Astrid St (.83) e Dennis St. from Congress to Decatur Pike (.62) ¢ Woodward Ave. from N. Jackson St. to Ingleside Ave (1.07) e Forrest Ave. from Ingleside Ave. to Madison Ave (.29) ® Guille St. from Ingleside Ave. to Eastanallee Ave (.12) e Glendale Ave. from Park St. to Cedar Springs Rd (.29) @ Cedar Springs Rd. from Glendale Ave. to Elizabeth St (17). Public Works Director applications of priorities. Public Works Director 156 City Council approved the 9 list of streets during April 2022, Gresham Smith Engineers completed final design and submitted to TDOT for approval. Once approved, projects will be bid out and bid considered by council. Completion during late 2025.