April 21, 2026 
Page 1 of 4 
 
Genuine Ingenuity 
 
2095 Lakeside Centre Way / Suite 210 / Knoxville, TN 37922 / 865-521-6777 / GreshamSmith.com 
 
LOCATION & DESCRIPTION 
The scope of services for the sidewalk connection around the McMinn County High School.  The project 
will begin at the existing sidewalk located at the intersection of Rocky Mt. Rd. and Sterling Rd to the 
intersection of Rocky Mt. Rd, and Dennis St. then heading north along Dennis St. to the intersection of 
Congress Parkway.  The design will include a five-foot sidewalk with a minimum two-foot buffer from curb 
line to sidewalk and supporting task listed below.    
 
Property Survey (MAP Surveying): See attached  
 
 
Topographic Survey: 
 
The tasks for survey and property survey coordination: 
 
1. Submit Utility One-Call Notifications 
2. Perform topo survey (pavement, curbs, sidewalks, pavement marking, buildings, other features) 
3. Perform utility survey 
4. Perform drainage features survey 
 
 
Preliminary Design: 
 
The tasks for Preliminary plans and coordination: 
 
1. Survey coordination and review. 
2. Horizontal and vertical alignment layout. 
3. ORD Template and corridor design.  
4. Stormwater design: 
a. Analysis of drainage area. 
b. Evaluation for ditches, cross drains and/or catch basins.  
5. Plan production.  
a. Title 
b. Typical 
c. Property Map and Acquisition table 
d. Plan and Profile 
e. Cross sections.  
6. Preliminary utility coordination to include initial contact with known utilities on project.  
7. QA/QC 
8. Review Meetings with City staff (1 meeting) 
9. Deliverable for preliminary phase will be preliminary plans set as pdf. 
 
ROW Design: 
 
The tasks for ROW plans and coordination: 
 
1. Finalize horizontal and vertical alignment layout. 
2. Finalize ORD Template and corridor design.  
3. Finalize Stormwater design: 
a. Analysis of drainage area. 