2026 5 11 Work Session Packet
City Council · packet · 122 pages · Descriptive metadata inferred from filename
Extracted text for page 95
Unverified text extraction. Check the original page for numbers, names, and layout.
Agenda Item V. K. Proposal from Gresham Smith Engineers to Design and Prepare Construction Documents to Complete the Sidewalk Loop Around McMinn County High School Overview The city began work on a five-foot wide concrete sidewalk loop project around the McMinn County High School along Congress Parkway, Dennis Street, and Rocky Mount Road during 2018 and sections were completed during 2018, 2022 and 2023 using TDOT funds and local funds . So far about 5,000 linear feet have been constructed leaving about 3,000 linear feet remaining to be constructed (see attached project map). To complete this sidewalk project, easements need to be acquired from three property owners, and they have all expressed interest in completing this sidewalk project. Gresham Smith Engineers has submitted a proposal to survey, design, prepare construction documents, assist with bidding, and assist with project management for a cost of $ 95,547 plus $9,000 for boundary survey and construction staking for an engineering cost of $104,547 (proposal attached). Construction cost is estimated to be $250,000 plus a 10% contingency of $25,000 for a total estimated construction cost of $275,000. That would make the total project cost $379,547. The design phase would occur from June to August, the bid phase would occur during August, and the construction phase would occur from September to November, 2026. $250,000 has been placed in next year’s Capital Improvement Fund budget for this project which is $129,547 short. Action to Consider Consensus is needed to move this item to the May 19, 2026 regular session for consideration. Affected Departments Public Works 87 Work Session May 11, 2026