PUBLIC WORKS TO: C. Seth Sumner, City Manager FROM: Kevin L. Helms, Project Manager Cc: Ben Burchfield, Public Works Director DATE: October 4, 2022 SUBJECT: SMART Grant Application Background The Bipartisan Infrastructure Law (BIL) created a program intended to fund innovation and technology in the field of transportation. The intent is to collect data from the implementation of these technologies to determine which are viable and which are not , as well as to determine if some are more suited for situations involving certain criteria. The BIL is funded at a level of $100,000,000 per year over five years. Process The program funds two different stages of grants. The first stage is a Planning and Prototyping stage and the second is an Implementation Stage. Funding is available each year for both stages. A planning grant application will be the first step in the process. If a planning grant is awarded, then an application can be made for an implementation grant once the plan is complete. Stage two grants will only be awarded to those that receive a stage one grant. Applications for this year are due by November 18 th. Stage one grants have no minimum amount that must be requested but may be no more than $2,000,000 per project. Stage one grants do not require a local cost share. Stage two grants can be in an amount of up to $15,000,000. Action Item The Public Works Department is requesting that the attached resolution be approved authorizing us to submit a stage one application. We are seeking a grant which would allow us to prepare a study to assess the results of an integrated traffic signal netwo rk throughout the community. The system would allow for proactive changes to traffic signal timing based upon real time traffic patterns. The department already possesses some of the components needed to do this, but much more needs to be done in the system to make it a reality. The benefits can apply to ongoing operations and heavy demand due to special events. If implemented, we anticipate the results to be a reduction of travel times and air pollution. Additional potential benefits could include increased safety on the roads and a reduction in call times for emergency response vehicles. 22