2022 10 18 City Council
City Council · packet · 73 pages · Descriptive metadata inferred from filename
Extracted text for page 21
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS $2,371,902.77 for eligible activities. This balance requires a maximum co -funding level of 15%, or $355,785.22. While the non-competitive funds are allocated, they are not obligated. Agencies must apply to TDEC detailing activities it intends to utilize the funds for in order to have them dedicated to the City. The Public Works Department intends to utilize ARP funds for the following activities: 1. Perform a stormwater utility feasibility study and implement it as soon as practicable 2. Implement an asset management system to serve as the system-of-record for existing GIS data of MS4 assets. This system will be used for work-order tracking and targeting/prioritizing annual repairs and capital improvements planning 3. Hydrologic engineering assessment and design at a localized and system -wide level to develop tangible solutions to address existing stormwater issues within the City and project needs based on continued growth and densification 4. Replace and install new green stormwater infrastructure within the MS4 network to improve water quality and mitigate localized flooding . Continued growth and lack of adequate infrastructure will lead to further damage to streams due to alteration and sedimentation The Department intends to pursue utilization of the full allocation. Any non -competitive allocations that are not utilized, either from lack of application, or lack of eligible activities, shall be dedicated to a secondary competitive application period that any State agenc y can a pply for. To allow our non- competitive allocation to be lost and shifted to the competitive program would be a considerable missed opportunity to position the Department for long- term success in adequately funding and managing the stormwater system. Action Item The Public Works Department is requesting that Council authorize submittal of an application to request allocation of ARP funds for the aforementioned activities. Applications must be submitted electronically and are due no later than November 1 st, 2022. TDEC has stated that all applications are to be reviewed and a determination of funding eligibility to be provided approximately 30 days after submittal of application. All ARP funds will be fully obligated by the State by December 31 st, 2024, and all ARP funds must be fully expended by December 31st, 2026. 19