2022 10 18 City Council
City Council · packet · 73 pages · Descriptive metadata inferred from filename
Extracted text for page 20
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS TO: C. Seth Sumner, City Manager FROM: Ben Burchfield, Public Works Director Cc: Kevin Helm, Project Manager DATE: October 4, 2022 SUBJECT: Authorization to Submit Application for TDEC ARP Stormwater Project Funding Background Tennessee’s Water Infrastructure Investment Plan (WIIP) describes how the State of Tennessee plans to invest the state’s American Rescue Plan (ARP) fiscal recovery funds in water infrastructure projects. These funds were authorized and appropri ated by the federal American Rescue Plan Act (ARPA). The state’s Financial Stimulus Accountability Group (FSAG) designated $1.35 billion for the Tennessee Department of Environment and Conservation (TDEC) to administer for this purpose. TDEC is administering $1 billion through non -competitive, formula- based grants. Funds are made available through the State Water Infrastructure Grants (SWIG) program to be used for eligible drinking water, wastewater, or stormwater projects. The City of Athens maintains a municipal separate storm sewer system (MS4) permit with the State of Tennessee Department of Environment & Conservation (TDEC). This permit is required of municipalities and other agencies that maintain stormwater systems that discharge into Waters of the S tate (WOTUS). Maintaining this permit is mandatory and unfunded. The Public Works Department maintains the MS4 system, and has taken considerable strides to expand, upgrade, and repair whenever able; however, Athens does not have a dedicated stormwater uti lity fund for these operations, and we will continue to fall further behind annually until efforts are made to implement a stormwater utility which will fund staff to inspect and maintain the system and fund capital projects to expand and repair the system as the City continues to grow. ARP funds are an ideal mechanism to dedicate to studying, planning, and constructing improvements to the City’s MS4 network. Process ARP funds have been allocated by the state based on a three- fold formula. The total allocation is comprised of three allocations : base allocation, population allocation, and ATPI -population allocation. Between those three, Athens has been allocated a maxim um non- competitive monetary balance of 18