Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2026 3 9 Work Session Packet City Council 1

City Council · packet · 30 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 7

Unverified text extraction. Check the original page for numbers, names, and layout.

Agenda Item 
IV. C. Resolution 2026-12, a Resolution to Apply for a 2026 Community Development 
Block Grant (CDBG)  
Overview 
The Public Works Department is requesting authorization to submit a n application for a federal 
CDBG grant to construct downtown improvements along Madison Avenue, Washington Avenue, 
White Street and Jackson Street in accordance with the Downtown Master Plan concept from 2020 
(see attachment) and specific downtown plans that are currently being developed. Specific 
improvements consist of  curbing improvements, landscaping, pedestrian signals, ADA 
accessibility improvements, s tormwater enhancements, and pedest rian crosswalk improvements . 
This project would improve pedestrian safety, reduce vehicle crashes, address ADA issue, and 
improve the aesthetics of the downtown area.  
T
he estimated cost for this project is $ 1,008,000 with $900,000 coming from the grant and the 
balance of $108,000 (required local match) coming from the city’s Capital Improvement Fund, if 
the grant is awarded.  
A
ttached is a memo from the Public Works Department with additional details. 
Action to Consider 
Consensus is needed to move this item to the March 17, 2026 regular session for consideration. 
Affected Departments 
Public Works Department 
5