2026 5 19 Regular Session Packet City Council
City Council · packet · 120 pages · Descriptive metadata inferred from filename
Extracted text for page 65
Unverified text extraction. Check the original page for numbers, names, and layout.
April 21, 2026 Page 3 of 4 Genuine Ingenuity 2095 Lakeside Centre Way / Suite 210 / Knoxville, TN 37922 / 865-521-6777 / GreshamSmith.com Project Bidding: The tasks for project bidding. 1. Bid documents. 2. Bid advertisement. 3. Bid tabulation. 4. Deliverable for Bidding phase will be EJCDC project manual. Project Management: The tasks for project management. 1. Project invoicing. 2. Sub-Consultant coordination. 3. Coordination with City project manager. ASSUMPTIONS 1. Design will follow TDOT and City of Athens standards and specifications. 2. Railroad coordination is not required. 3. Railroad crossing will be like the crossing at 162 Tellico Ave. The details will include the rubber gasket, pavements and grading for ADA compliance. 4. Based on proposed project length SWPPP is not required. 5. MAPS survey will set project control. REQUESTED INFORMATION 1. City to provide GIS utility information SERVICES NOT INCLUDED IN THE SCOPE OF WORK The following items are not anticipated to be required at this time and are therefore specifically excluded from the scope. These services may be added at the CLIENT’S request as extra service. 1. ROW exhibits, acquisitions, negotiations, and appraisals. 2. SWPPP, ARAP and/or ACOE permits and fees. 3. Traffic study. 4. Signal design. 5. NEPA Document. 6. Hydrologic Determination. 7. Geotechnical services. 8. Utility relocation plans. 9. Railroad coordination. 10. ORD Model. 11. Structural Retaining Wall Design. 12. Construction Engineering and Inspection Services 54 Regular Session May 19, 2026