April 5, 2022 Director Burchfield Page 7 of 7 Reference: City of Athens Fire Training Facility 23. No-offsite water and sewer design or evaluation is included in the Scope. This Scope assumes that adequate water and sewer services are available at the site. 24. Right-of-way, easements, “as-built” surveys, and platting services are not included in this Scope of services. 25. Design fees are based on the approved site concept plan. Any changes to the concept plan after design has begun will be considered additional services and a separate fee will be negotiated. 26. Site retaining walls are excluded from this Scope. If required, Stantec will provide site retaining walls as additional services and billed according to the attached Rate Table. BILLING AND TERMS OF PAYMENT Fees for Fixed Fee Tasks will be invoiced monthly based on the percentage of each task completed to date and will be due within 30 days. Time and Materials charges will also be billed monthly as incurred. Regards, STANTEC CONSULTING SERVICES INC. Tim Hancock, AICP Principal Phone: 423-800-5350 Mobile: 239-213-8728 tim.hancock@stantec.com Jan Pass, PE Technical Lead Phone: 423-800-5350 Mobile: 423-645-9511 jan.pass@stantec.com Attachment: Stantec Standard Terms and Conditions; Schedule of Fees 36