2022 04 19 City Council
City Council · packet · 76 pages · Descriptive metadata inferred from filename
Extracted text for page 37
Unverified text extraction. Check the original page for numbers, names, and layout.
April 5, 2022 Director Burchfield Page 6 of 7 Reference: City of Athens Fire Training Facility for additional testing requirements should our analysis require additional information. 4. Terms and Conditions will be agreed to in a mutually beneficial manner. No work can begin until this agreement is fully executed. 5. Geotechnical investigation, report and design services are not included. 6. Preparation of an Environmental Impact Statement is not included. 7. Parcel boundary survey services and topography will be provided by others. 8. Hazardous materials and spills investigation, testing, reporting and design are not included. 9. Preparation and filing of a new subdivision map are not included. 10. Completion of grant funding applications and procedures are not included. 11. Wetlands delineation is not included. 12. Construction phase services extending beyond sixteen (16) months from the construction kick-off meeting are not included. 13. Development of a Storm Water Pollution Prevention Plan is included in the fee. 14. Traffic studies or traffic controls design are not included. 15. Permitting fees are not included. 16. The client’s designated Construction Manager (Client provided) will be solely responsible for the Project Budget. Stantec will aid in identifying line items and quantities. 17. No design is included for temporary fueling systems. 18. B orings / Site investigation to check for possible petroleum spill in soil and groundwater is excluded. 19. Remediation related services are excluded. 20. Additional landscape design beyond the minimal required by Ordinance/Regulation, including hardscape and a detailed landscape plan, may be provided as Additional Services. 21. Design and permitting activities associated with wetlands, floodplains, hazardous materials, ecological issues, etc. are excluded from this Scope. A flood study is excluded from this scope. 22. This scope assumes that the existing off-site drainage systems are adequate for use in this project. No off -site stormwater evaluation or design is included in this scope beyond connecting to existing drainage or utilities, or as required by the associated Stormwater Regulations. 35