Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2022 04 19 City Council

City Council · packet · 76 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 24

Unverified text extraction. Check the original page for numbers, names, and layout.

Specific Services not Included in the Scope (continued) 
• S tructural evaluation and/or calculations. 
• Archaeology Study 
• Historic/Architectural Assessment, 
• Phase I Environmental Site Assessment 
• Ecology Assessment 
• Threatened / Endangered Species Survey 
 
Payment to the Engineer:  
OWNERS’S RESPONSIBILITIES 
 
Owner shall pay Engineer for Basic Services set forth in the Agreement for PHASE 1 
Services, as follows: 
 
• Under no circumst ances shall the amount payable to the Engineer ex ceed 
$96,410.00 for NEPA, design, bidding, and Geo-tech services without the written 
consent of both the Engineer and the Owner. 
 
 
Fee for PHASE 2 Services Engineer will perform the services described above for PHASE 
2 SERVICES on an hourly not to exceed basis with an estimated amount of $81,000. This 
estimate is based on a 60 calendar day construction schedule. If the contract goes longer 
than the estimated period, Engineer will negotiate the added time with the owner. 
22