2022 04 19 City Council
City Council · packet · 76 pages · Descriptive metadata inferred from filename
Extracted text for page 21
Unverified text extraction. Check the original page for numbers, names, and layout.
Smith will be prepared to provide to the TDOT Hazardous Materials Section for clearance. An asbestos survey will not be required. • Air Quality – After receiving the Purpose and Need D ocument, TDOT will provide Gresham Smith the Air Quality statement to include in the NEPA document. An air quality report will not be required. • Noise – Because this is a Ty pe III project, a noise study is not needed. Gresham Smith will coordinate with TDOT regarding a noise statement to add to the NEPA document. • Ecology – Gresham Smith will conduct a database search for stream, wetlands, and threatened/endangered species habitats to include in the Purpose and Need Document. This document will be provided to TDOT’s Ecology Section so they may conduct coordination with the following state and federal agencies, the Tennessee Department of Environment and Conservation (TDEC), Tennessee Wildlife Resources Agency (TWRA), and United States Fish and Wildlife Service (USFWS). Prepare NEPA Document Gresham Smith will develop th e C-List CE document using the TDOT Local Programs template. The results of the coordination, the purpose and need statement, a description of the build alternative, and the results of the technical studies/analysis will be incorporated into the C-List CE . The NEPA document will be offered to the City for review and comment (if requested). Once the City has approved the document, it will be submitted to TDOT for review and comment. Gresham Smith will finalize the C- List CE for TDOT signature. The result of this task is a signed C- List CE. With the acceptance of the C-List CE, the TDOT Local Programs Office will be provided the signed document to issue a Notice to Proceed. Schedule It is anticipated t hat the C -List Categorical Ex clusion will take f our months to complete. However, this estimate for completion is based on a timely review of the coor dination documents provided to TDOT, the State Historic Preservation Office (SHPO) review and the timely s ubmission of the TDOT Archaeolo gy Section submittal to the Native American Tribes, all are subject to their scheduling. Additional Information Due t o the unique nature of Local Programs projects, Gresham Smith will coordinate with the TDOT Local Programs contact within TDOT Environmenta l Div ision before beginning any NEPA work. This will continue during all technical section and agency coordination and throughout the environmental clearance process. 19