PACKET 2026 6 8 Work Session website
City Council · packet · 193 pages · Descriptive metadata inferred from filename
Extracted text for page 95
Unverified text extraction. Check the original page for numbers, names, and layout.
81 FY 2029 Estimated Cost Vehicles Replace Mini Excavator 75,000 Total Vehicles 75,000 Capital Projects Oost WWTP - Renovate Chemical Building 300,000 Oost WWTP - UV Bulbs 65,000 NMC - Replace Sludge Thickener (delete if sludg 350,000 NMC - Side-by-Side UTV replacement 25,000 Convert Park Village P.S. to Gravity Sewer 325,000 Velma Rd.-Gravity Sewer Replacement (w/ LPS- 1,500,000 Total Capital Projects 2,565,000 Continuous Items Oostanaula WWTP Refurbishment 200,000 NMC WWTP Refurbishment 100,000 Admin and Operators Buildings Maint. - Oost. 15,000 Laboratory Equipment 15,000 Lift Station Rehabilitation 50,000 Field and Safety Equipment 20,000 Collection System Rehab 750,000 Material Donations 5,000 Technology (SCADA, GIS, MH Elev. Project, Com 60,000 Services 500,000 Extensions 25,000 Grinder Pump Core Replacements 140,000 Manhole Rehabilitation 30,000 Rehabilitation of Services 75,000 IT Core (Servers, mainframe, etc.) 20,000 Total Continuous Items 2,005,000 Vehicles 75,000 Capital Projects 2,565,000 Continuous Items 2,005,000 Total 4,645,000