PACKET 2026 6 8 Work Session website
City Council · packet · 193 pages · Descriptive metadata inferred from filename
Extracted text for page 93
Unverified text extraction. Check the original page for numbers, names, and layout.
79 FY 2027 Estimated Cost Replace NMC Plant Truck #61 (2013 F150) 45,000 Total Vehicles 45,000 Capital Projects Oost WWTP - Manual Coarse Bar Screen/Bypass 250,000 Oost WWTP - Replace Inf. 1,2; Pipes; 2 Check Va 800,000 Oost WWTP - Digester Motive Pumps 50,000 Oost WWTP - Rotating Assy (RAS Pumps) 35,000 NMC WWTP - UV Bulbs 35,000 Replace 3,500 l.f. Central (Slack to Hicks), spray 1,200,000 Total Capital Projects 2,370,000 Continuous Items Oostanaula WWTP Refurbishment 200,000 NMC WWTP Refurbishment 100,000 Admin and Operators Buildings Maint. - Oost. 15,000 Laboratory Equipment 15,000 Lift Station Rehabilitation 50,000 Field and Safety Equipment 20,000 Collection System Rehab 750,000 Material Donations 5,000 Technology (SCADA, GIS, MH Elev. Project, Com 60,000 Services 500,000 Extensions 25,000 Grinder Pump Core Replacements 140,000 Manhole Rehabilitation 30,000 Rehabilitation of Services 75,000 IT Core (Servers, mainframe, etc.) 20,000 Total Continuous Items 2,005,000 Vehicles 45,000 Capital Projects 2,370,000 Continuous Items 2,005,000 Total 4,420,000