PACKET 2026 6 8 Work Session website
City Council · packet · 193 pages · Descriptive metadata inferred from filename
Extracted text for page 75
Unverified text extraction. Check the original page for numbers, names, and layout.
61 FY 2029 Estimated Cost Vehicles Backhoe 150,000 Total Vehicles 150,000 Capital Projects Replace CI Water Line RR Ave. (East Ave. to Tell 1,500,000 Emergency Generator for Spring 500,000 Raw Water Static Mixer 100,000 Combined Plant Eff. Static Mixer 100,000 Raw Tank at WTP, Pipe work 2,500,000 AMI Project 720,000 Total Capital Projects 5,420,000 Continuous Items Water Plant Maint and Lab Equipment 50,000 Meter Change Out (Large, Small and Testing) 40,000 Reservoir and Pump Maintenance 40,000 Water Line Extensions 200,000 Distribution Rehabilitation 200,000 Field and Safety Equipment 25,000 Water Services 300,000 Technology (SCADA, Computers) 50,000 IT Core (Servers, mainframe, etc.) 20,000 Total Continuous Items 925,000 Vehicles 150,000 Capital Projects 5,420,000 Continuous Items 925,000 Total 6,495,000