PACKET 2026 6 8 Work Session website
City Council · packet · 193 pages · Descriptive metadata inferred from filename
Extracted text for page 73
Unverified text extraction. Check the original page for numbers, names, and layout.
59 FY 2027 Estimated Cost Vehicles Lowboy Trailer 60,000 Replace Truck #88 (Single Axle Dump) 150,000 Tractor Replacement + tiller attachement 50,000 Total Vehicles 260,000 Capital Projects Diesel Generator for Highlands 100,000 Sandblast and Re-Paint Reservoir #2 120,000 Matlock Phase 1 - Madison to Crestway 1,300,000 Test Wells 250,000 Water Leak Survey 40,000 Tank #6** 6,500,000 Locker Room Improvements 30,000 Raw Water Line Bore under Oost. Creek 75,000 AMI Project 720,000 Total Capital Projects 9,135,000 Continuous Items Water Plant Maint and Lab Equipment 100,000 Meter Change Out (Large, Small and Testing) 30,000 Reservoir and Pump Maintenance 40,000 Water Line Extensions 200,000 Distribution Rehabilitation 200,000 Field and Safety Equipment 25,000 Water Services 300,000 Technology (SCADA, Computers) 70,000 IT Core (Servers, mainframe, etc.) 20,000 Total Continuous Items 985,000 Vehicles 260,000 Capital Projects 9,135,000 Continuous Items 985,000 Total 10,380,000