These improvements illustrate the Plan's central conveyance -versus-storage issue. The Clark Street Bypass could increase peak discharge from the Leveck branch by nearly 300 percent during larger storms, while the Madison Avenue improvements could increase the overall Downtown system's 10 -year discharge to Oostanaula Creek from approximately 350 cfs to 679 cfs. Accordingly, the Plan estimates that approximately 34 acre -feet of detention distributed across multiple locations would be needed to bring the improved Downtown system's 10-year discharge back to approximately existing conditions. The identified locations are conceptual, and the City is encouraged to obtain equivalent storage in similar hydraulic locations as property becomes available. For Cook south via White Street, the first recommendation is optimization of the existing Cook Drive detention pond. Replacing its outlet structure is projected to reduce peak discharge by approximately 34 to 67 percent depending upon the storm event. Downstream, approximately 1,955 linear feet of pipe improvements are recommended along North White Street and Washington Avenue. These improvements increase the system to approximately a 10 -year level of service and dramatically reduce the number of localized issues during larger storms. To prevent the increased conveyance from simply transferring additional runoff to Oostanaula Creek, approximately 7.1 acre-feet of additional storage is recommended within the watershed, potentially using a combination of above ground and underground detention. The final section of the Masterplan is a proposed Capital Improvement Plan. Targeted future projects identified include Layman Road to Regional Park at approximately $4.9 million, Tellico & Towanda Trail at $1.4 million, Clark Street Bypass at $5.4 million, Madison Avenue Bypass at $8.1 million, and North White Street at $3.9 million. These projects establish a preliminary future Capital Improvement Plan budget of approximately $23.7 million. Regional Park dredging, Mayfield Regional Detention, and Cook Dr pond retrofits projects have already been funded and constructed and are excluded from the total. Council should understand that the $23.7 million figure should not be interpreted as the City's total long -term stormwater liability. It excludes replacement of deficient bridges and other hydraulic structures along Oostanaula and North Mouse Creek, property acquisition, and the construction of the substantial detention storage recommended in Section 6. These costs were intentionally not developed because final locations, property costs, and stormwater infrastructure remain site-specific and extremely variable. The Masterplan also notes that establishment of a stormwater utility fee as the City's primary dedicated funding mechanism is the critical piece to advancing any significant improvements where dedicated r evenue would support capital improvements, aging/failing infrastructure replacements, MS4 compliance and administration of the stormwater program. While state and federal grants could serve as supplemental sources of funding, particularly for larger projects, a baseline funding mechanism established locally is essential. The MS4 Utility Feasibility study is undergoing final revisions and will be provided to Council as well, but the primary considerations from its deliverables will need to be discussed at the next strategic planning sessions in February as part of the budgetary process. In summary, the Masterplan establishes that Athens' stormwater challenges cannot be addressed through isolated pipe replacements or individual drainage projects alone. The recommended strategy is a coordinated combination of conveyance improvements, detention 20 Work Session October 12, 2026