The Masterplan’s analysis incorporates FEMA studies, historical USGS stream- gage information, TDOT bridge and culvert records, City GIS and engineering plans, field survey, LiDAR, land -use information, soil data, and current precipitation -frequency data. HEC -HMS and HEC -RAS were used to evaluate watershed runoff and the primary riverine system, while PCSWMM was used to evaluate the City's closed storm sewer systems. The models were calibrated to available historical information, with an emphasis on the May 2003 flood. Although additional stream and rainfall monitoring would improve future calibration, the Plan concludes that the models provide a reliable foundation for infrastructure planning and flood mitigation. T he primary -system analysis identifies several bridge and culvert crossings with inadequate capacity or freeboard. Along Oostanaula Creek, bridge crossings received poor or failing capacity ratings, while every evaluated Oostanaula crossing was deficient in freeboard. North Mouse Creek crossing at Hwy 305 and Decatur Pike perform better under most events, with 305 being more vulnerable to lower frequency intervals storms that result in overtopping . This is particularly problematic as this is a primary corridor in and out of North Athens via exit 52. T he secondary -system analysis confirms significant deficiencies in all three focus areas. The Tellico & Towanda Trail area experiences issues beginning with events as small as the two -year storm. Leveck to Downtown Athens generally has less than a two -year level of service, with substantial capacity problems throughout several branches of the system. Cook Dr south along North White Street likewise has less than a two-year level of service, with substantial surcharging and flooding along the corridor. The recurring issues are generally attributable to undersized or shallow pipes, poor or negative slopes, bottlenecks, elevated tailwater conditions, and the incremental way the system developed over time through various additions prior to the advent of engineering practices that insisted attention be paid to iteratively upsizing stormwater infrastructure and stormwater best management practices. T he primary -system recommendations establish a broad strategy for the City's streams, floodplains, bridges, and culverts. A central recommendation is that the hydraulic models developed as part of the masterplan remain active planning tools rather than static studies. The Plan recommends stream gages, rainfall monitoring, periodic channel surveys, and coordination with future land -use, transportation, and economic -development decisions. There are opportunities for Athens to partner with other agencies to install and maintain such tools. Fo r deficient bridge and culvert crossings, the Plan recommends prioritizing replacement of structures with low levels of service, considering retrofit or deck -raising of structures with adequate capacity but inadequate freeboard, and coordinating closely with FEMA and TDOT. Because several affected structures are within TDOT rights-of-way, interagency coordination will be necessary. W ithin the North Mouse Creek watershed, the Plan focuses heavily on North Mouse Creek Tributary 1. Regional Park has experienced substantial sediment accumulation, and dredging was advanced into construction. The Plan identifies stream erosion between Layman Road and Regional Park Drive as a significant driver of this sediment and recommends stream restoration and bank stabilization to reduce recurring sediment deposition and protect exposed utilities. T hat culminates into the proposed Layman Road project. Existing culverts experience overtopping at relatively frequent storm intervals, including overtopping of the Layman Road crossing during approximately a two-year event. The proposed alternative removes a section of 18 Work Session October 12, 2026