2026 10 20 Council Meeting Packet
City Council · packet · 58 pages · Descriptive metadata inferred from filename
View PDF on the City website · page 21
The PDF opens on the City of Athens website in a new tab. Use PDF page 21 to check the cited record.
Extracted text for page 21
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS MEMORANDUM TO: Bridget Roberts, Interim City Manager FROM: Ben Burchfield, Public Works Director DATE: October 7, 2026 SUBJECT: ARP MS4 Masterplan Background The Athens Storm water Master plan, completed in conjunction with the City’s engineering partner Gresham Smith, provides a comprehensive analysis for addressing existing and future stormwater challenges throughout Athens . The Plan was funded through the America n Rescue Plan (ARP) grant and was developed in response to Athens' history of impaired waterways and localized flooding, aging and undersized drainage infrastructure, continued urbanization creep, and need for a targeted long-term capital investment plan. The Masterplan evaluates both the City's "primary" stormwater system consisting principally of Oostanaula Creek, North Mouse Creek, other “gray-line” tributaries, bridges, culverts, and open channels, in addition to i ts "secondary" system, consisting primarily of storm sewer pipes, culverts, ditches, and detention facilities. Staff decided that the secondary system analysis needed to concentrate on three historically problematic areas: Tellico Ave/Towanda Trail, Leveck Addition to Downtown Athens, and Cook Dr south along North White Street. Athens has a documented history of significant flooding, particularly along Oostanaula Creek and North Mouse Creek. Historical events include the March 1973 flood and the May 2003 event, during which more than 11 inches of rain fell in Athens within approx imately 35 hours. These events, in addition to even smaller recurrence interval events, result in widespread damage to the waterbodies within Athens through alteration & sedimentation. The Plan also recognizes that local waterways are identified as being impaired for E. coli, and nutrients, which are derivatives of rural agricultural activity and utility overflows . These are issues that are all documented and identified for each waterway segment on the TDEC 303d list. 17 Work Session October 12, 2026