TO: Deb Wallace, City Manager FROM: Kevin L. Helms, Project Manager Cc: Ben Burchfield, Public Works Director April Johnston, Street Superintendent DATE: January 3, 2024 SUBJECT: N Jackson Street Repairs Background In September the City Council approved an engineering agreement for the Public Works Department to move forward with repairs on N Jackson Street. As part of th e design process, GEOS performed geotechnical testing for the City’s Engineer of Record, Gresham Smith. The purpose of the testing was to evaluate the subsurface conditions for design purposes on the roadway repairs. Three test sites were chosen, and the results showed no base stone under the asphalt at any of the locations. Immediately below the asphalt layer is a layer of fill which met proper compaction in certain areas, but failed compaction tests in other areas. Therefore, it is likely an unknown amount of cut and fill will be needed during construction. Based upon the above conditions and the steepness of the slope along the railroad the engineers have recommended a Slope Stability Analysis. Proceeding without the analysis could result in the designer not properly accounting for the unknown existing slope conditions. We have included in your packet a copy of the proposal from GEOS to perform the Slope Stability Analysis. The proposal is for three tests to be performed at a cost of $3,000. If the initial results indicate the need for additional test sites, each additional site will be billed at $750. Currently, the City has saved $2,594 on the design work due primarily to providing traffic control with our own forces, and because data collection was less than anticipated. In the event more than three test sites are needed, the savings are sufficient to cover the cost of up to three additional test sites. Action Item Approve the GEOS proposal as presented to perform the Slope Stability Analysis so we can move forward with project design. 18