Athens TransparencyPublic records. Clearer understanding.Local research preview

Source library

2026 2 20 Strategic Summit Packet

City Council · packet · 53 pages · Descriptive metadata inferred from filename

Open original PDF
Extracted text for page 3

Unverified text extraction. Check the original page for numbers, names, and layout.

FY 2024-25 ACCOMPLISHMENTS 
 
• Gave the old Westside School to the City Board of Education and contributed $1M for renovations.  
 
• Repaired the splash pad at Regional Park so all water functions are working.  
 
• Modernized the concession stands point -of-purchase equipment at Regional Park and Ingleside Park 
for better control and pricing of concession items for revenue enhancement.  
 
• Repaired the pavilion and solar panel at Echo Park. 
 
• Completed Ingleside Park improvements consisting of updated tennis courts and pickleball courts.  
 
• Partnered with TDOT to resurface W. Madison Street, W. Washington Street, N. White Street, and N. 
Jackson Street and restriped  the parking spaces around the courthouse for better traffic flow and 
pedestrian safety.   
 
• Purchased various vehicles and equipment including two replacement police vehicles and equipment, 
leaf vacuum machine, bucket truck, and two snowplows for Public Works.  
 
• Issued approximately 20 single-family home building permits.  
 
 
 
 
 
 
 
 
 
 
 
 
Splash Pad at Regional Park