2022 06 21 City Council
City Council · packet · 304 pages · Descriptive metadata inferred from filename
View PDF on the City website · page 65
The PDF opens on the City of Athens website in a new tab. Use PDF page 65 to check the cited record.
Extracted text for page 65
Unverified text extraction. Check the original page for numbers, names, and layout.
Qty Units Unit Price 1 LS 5,556.21 $ 1 LS 15,823.50 $ TOTAL ‐$ 21,379.71$ Approved By (Architect) Date: Approved By (Owner) Date: Approved By (Contractor) Date: 10 days APPROVALS Description of Requested Changes Item Total Furnish and installation of two (2) data drops per wall/ceiling outlet; provide 8 drops for floor box. Removal of rack per Owner. Relocation of IT room per updated drawings by Allen & Hoshall. Change Order No. Integrated Properties Allen & Hoshall Jon Clinard City of Athens ‐$ Requested By Date of Request Contractor Add thirty (32) data rough ins, eight (8) receptacles, four (4) card access, two (2) CCTV camera, etc. Cabling see above 15,823.50$ Scope Description IT Room & Add'l Drops see above 5,556.21$ ‐$ P.O. Box 91298, Chattanooga, TN 37412 (423) 643‐8448 Any change in Contract time required: CHANGE ORDER REQUEST FORM Project Name Project # Project Manager Owner Athens Public Works Renovations and Addition 8 6/6/2022 Architect/Engineer 22‐002 Kevin Helms Add new floor drain at room 123, rough in for room 118 was complete prior to RFP. 6/7/2022 63