2022 06 21 City Council
City Council · packet · 304 pages · Descriptive metadata inferred from filename
Extracted text for page 59
Unverified text extraction. Check the original page for numbers, names, and layout.
Qty Units Unit Price 1 LS 33,728.00 $ 1L S (4,590.00)$ 1 LS 9,689.00 $ 1 LS 1,196.15 $ TOTAL OH&P Add'l Framing Mods per structural comments 9,689.00 $ 40,023.15$ Approved By (Architect) Date: Approved By (Owner) Date: Approved By (Contractor) Date: 15 days APPROVALS ‐$ $15,948.60 x 7.5% 1,196.15 $ Change Order No. Integrated Properties Allen & Hoshall Jon Clinard City of Athens COR #1 through #3, COR #5 through #10 = $52,121.60. $52,121.60 + $38,827.00 (COR #11) = $90,948.60 total current COR cost $90,948.60 ‐ $75,000.00 = $15,948.60 total over contingency. Requested By Date of Request Contractor Connection to be made using TEK hex/washer head screws and attached to angle clips to steel framing, no welded connections included. Description of Requested Changes Deletion of metal panel demolition from scope of work. OH&P on the balance of the work outside of contingency allowance. Furnish and installation of metal track stud framing. Deduct Panel Demo see above & attached (4,590.00)$ Scope Description Framing Modifications see above & attached 33,728.00 $ Item Total P.O. Box 91298, Chattanooga, TN 37412 (423) 643‐8448 Any change in Contract time required: CHANGE ORDER REQUEST FORM Project Name Project # Project Manager Owner Athens Public Works Renovations and Addition 11 6/7/2022 Architect/Engineer 22‐002 Rob Thew Additional structural modifications per structural engineer comments. 6/7/2022 57