2022 06 21 City Council
City Council · packet · 304 pages · Descriptive metadata inferred from filename
View PDF on the City website · page 59
The PDF opens on the City of Athens website in a new tab. Use PDF page 59 to check the cited record.
Extracted text for page 59
Unverified text extraction. Check the original page for numbers, names, and layout.
Qty Units Unit Price 1 LS 33,728.00 $ 1L S (4,590.00)$ 1 LS 9,689.00 $ 1 LS 1,196.15 $ TOTAL OH&P Add'l Framing Mods per structural comments 9,689.00 $ 40,023.15$ Approved By (Architect) Date: Approved By (Owner) Date: Approved By (Contractor) Date: 15 days APPROVALS ‐$ $15,948.60 x 7.5% 1,196.15 $ Change Order No. Integrated Properties Allen & Hoshall Jon Clinard City of Athens COR #1 through #3, COR #5 through #10 = $52,121.60. $52,121.60 + $38,827.00 (COR #11) = $90,948.60 total current COR cost $90,948.60 ‐ $75,000.00 = $15,948.60 total over contingency. Requested By Date of Request Contractor Connection to be made using TEK hex/washer head screws and attached to angle clips to steel framing, no welded connections included. Description of Requested Changes Deletion of metal panel demolition from scope of work. OH&P on the balance of the work outside of contingency allowance. Furnish and installation of metal track stud framing. Deduct Panel Demo see above & attached (4,590.00)$ Scope Description Framing Modifications see above & attached 33,728.00 $ Item Total P.O. Box 91298, Chattanooga, TN 37412 (423) 643‐8448 Any change in Contract time required: CHANGE ORDER REQUEST FORM Project Name Project # Project Manager Owner Athens Public Works Renovations and Addition 11 6/7/2022 Architect/Engineer 22‐002 Rob Thew Additional structural modifications per structural engineer comments. 6/7/2022 57