2022 06 21 City Council
City Council · packet · 304 pages · Descriptive metadata inferred from filename
Extracted text for page 56
Machine-read OCR text; verify every number, name, and layout against the original page.
PUBLIC WORKS TO: C. Seth Sumner, City Manager Mike Keith, Finance Director FROM: Ben Burchfield, Public Works Director DATE: May 19, 2022 SUBJECT: Significant Hydraulic Repairs to 4359 Cat Mini Excavator Public Works had a catastrophic hydraulic pump failure on our 2016 Caterpillar mini excavator in March 2022. The time required for such an extensive diagnostic process, necessitated sending the equipment it to Stowers for assessment. We were initially hopeful the failure was limited in damage to the rest of the unit, and expected a cost around $20-30k to replace the pump assembly, flush, inspect lines, connections, etc. As Stowers assessed the unit they discerned that debris from the internal pump failure was distributed throughout the hydraulic system resulting in an extensive process of replacing virtually every component in the system in order to prevent future damage to the unit from residual debris lodged in the system. All told, the bill was significant. It totaled $51,505.43 for parts and labor, far exceeding the budgeted equipment R&M line item for street construction, which will necessitate a budget amendment. Unfortunately, repair of the unit was the only proper recourse to get a functional unit back in service, as anew replacement unit would be backordered as well as being even more costly — a comparable unit would cost approximately $140,000 today. There is a warranty on the new hydraulic system since repairs were completed by Stowers. It is the Departments intent to keep this unit in service beyond its original anticipated 10-year useful life in consideration of the costly repairs. If you have any further questions, do not hesitate to contact me to discuss. 54