2022 06 21 City Council
City Council · packet · 304 pages · Descriptive metadata inferred from filename
Extracted text for page 45
Machine-read OCR text; verify every number, name, and layout against the original page.
Capital Budget Wastewater Division Cash Available for Investment in Plant 7,395,903 Capital Expenditures: Replace Mini Excavator (2015) 65,000 Forklift 50,000 2020 Athens Sewer Improvements (Cedar Sp,/Sterling Ra)** 1,671,875 Vehicles 115,000 Oost WWTP UV Bulbs 45,000 Capital Projects 1,976,875 Replace Clarifier Drives (#2, #3) 160,000 Continuous 1,320,000 Replace Digester LMP (4 pumps) 100,000 3,411,875 Qostanaula WWTP Refurbishment 125,000 Continuous NMC WWTP Refurbishment 100,000 Continuous Admin and Operators Buildings Maint, - Oost. 10,000 Continuous Laboratory Equipment 15,000 Continuous Lift Station Rehabilitation 35,000 Continuous Field and Safety Equipment 15,000 Continuous Collection System Rehab 500,000 Continuous Material Donations 5,000 Continuous Technology (SCADA, Computers) 35,000 Continuous Services 200,000 Continuous Extensions 25,000 Continuous Grinder Pump Core Replacements 140,000 Continuous Manhole Rehabilitation 20,000 Continuous Rehabilitation of Services 75,000 Continuous IT Core (Seners, mainframe, etc.) 20,000 Continuous 3,411,875 Excess Cash after Plant Investments 3,984,028 ** $3.3 million Infrastructure Project financed with grants and loans over FY 23-24 35 43