2025 5 6 Budget Work Session Website 1
City Council · packet · 157 pages · Descriptive metadata inferred from filename
Extracted text for page 84
Unverified text extraction. Check the original page for numbers, names, and layout.
DIVISION PROFILE STAFFING PLAN FY 2025-26 BUDGET PRIORITIES PUBLIC WORKS Street Maintenance 903 The Public Works Department consists of eight divisions: the Administration Division, Traffic Control Division, Street Maintenance Division, Street Construction Division, Street Cleaning Division, Fleet Maintenance Division, Animal Shelter Division, and the Sanitation Fund. Position Title FY 2023-24 FY 2024-25 FY 2025-26 The Street Maintenance Division is responsible for the maintenance of city streets including repairing potholes and utility cuts, building driveway aprons, repaving streets, and cleaning the storm water system of culverts, ditches, and basins. Street Superintendent 1 1 1 Total Positions 5 5 5 Foreman Light Equipment Operator 1 3 3 1 1 3 • Storm water supplies expenses include $30,000 for pipes and concrete testing. • Fleet management expenses include $50,000 to transfer funds from this Division to the Fleet Management Fund for the future acquisition of replacement vehicles and equipment. • Strip paving expenses include $500,000 that will not be spent this fiscal year but will be saved and accumulated for future road resurfacing. 76