2025 5 6 Budget Work Session Website 1
City Council · packet · 157 pages · Descriptive metadata inferred from filename
Extracted text for page 104
Unverified text extraction. Check the original page for numbers, names, and layout.
FY 2025-26 BUDGET PRIORITIES CAPITAL IMPROVEMENT FUND Public Works • $193,000 for the Decatur Pike corridor traffic signal retiming project using city funds. Of those funds, $18,000 will be used for field implementation and operational analysis and $175,000 for equipment installation. • $2,067,000 to resurface nine city streets totaling 3.94 miles using Surface Transportation Block Grant-Local funds ($999,000) and city funds ($1,068,000). Of those funds, $205,000 will be used to complete the design and provide construction administration and $1,862,000 for construction. • $480,000 to stabilize and repair N. Jackson Street in front of city hall using city funds. Of those funds, $30,000 will be used to complete the design and provide construction administration and $450,000 for construction. • $305,000 to extend and pave View Street using city funds. Of those funds, $55,000 will be used to complete the design and provide construction administration and $250,000 for construction. • $600,000 for intersection improvements at West Madison Avenue, Rocky Mount Road, and Old Riceville Road using the state’s Railroad Grade Crossing Program 100% grant. Of those funds, $120,000 will be used for construction administration and $480,000 for construction. • $927,000 for intersection improvements at Ingleside Avenue and Tellico Avenue using a state Rural Safety Action 100% grant. Of those funds, $185 ,400 will be used for design and construction administration and $741,600 for construction. • $2,503,000 to complete the stormwater master plan and begin the selected stormwater improvement project using American Rescue Plan funds ($2,128 ,000) and city funds ($375 ,000). Of those funds, $427,000 will be used to complete the plan, design the project, and provide construction administration and $2,076,000 for construction. • $130,000 to continue the design of Green Street improvements including sidewalks, pedestrian crossings, and retiming of traffic signals using a state Multi-model Access grant ($117 ,000) and city funds ($13,000). The construction expenses for this project will be in the FY 2026-27 budget. • $50,000 to bu ild upon the downtown street and pedestrian improvement concept plan that was previously prepared and begin to move toward future construction by preparing preliminary engineer plans, refining priorities/phases, and obtaining cost estimates using city funds. Other Projects • $35,000 contribution to the City Board of Education for the city’s share of a new playground at the new school complex using city funds. • $250,000 to demolish North City School using city funds. • $1,900,000 to complete Mt. Verd Industrial Park improvements using an ARC grant ($950 ,000), city funds ($475,000), and county funds ($475,000 ). Of those funds, $100,000 will be used to complete the engineering and provide construction administration and $1,800,000 for construction. • $580,000 to replace the HVAC system at City Hall using city funds. 93