6 No. Program/Cost/Funding Source Responsible Party Status Public Works Department (continued) 47 Resurface 9 city streets totaling 3.94 miles, $1,716,710 using Surface Transportation Block Grant Local (STBG-L) funds. • Mt. Verd Rd. from Clearwater Rd to city limits (.34) • Sharp Rd. from Velma Rd. to Railroad Ave (.21) • Tellico Ave. from Congress to Astrid St (.83) • Dennis St. from Congress to Decatur Pike (.62) • Woodward Ave. from N. Jackson St. to Ingleside Ave (1.07) • Forrest Ave. from Ingleside Ave. to Madison Ave (.29) • Guille St. from Ingleside Ave. to Eastanallee Ave (.12) • Glendale Ave. from Park St. to Cedar Springs Rd (.29) Cedar Springs Rd. from Glendale Ave. to Elizabeth St (.17). Public Works Director / Project Manager City Council approved the 9 list of streets during April 2022, Gresham Smith Engineers completed final design and submitted to TDOT for approval. Waiting for TDOT to approve. Project is anticipated to be bid out during July 2025, bid considered by council during September 2025, and completion during 2026. 48 Prepare next round of local street paving set for 2026, $2,000,000 using local funds. Public Works Director 49 Prepare an electronic inventory/data base of major city storm water assets of location, size, and condition to determine stormwater needs. Then design and construct needed improvements, $2,727,688 using ARPA grant funds (85% grant/15% local). This study is a precursor to creating a storm water utility. Public Works Director / Project Manager Gresham Smith Engineers has collected all data. System modeling underway, Plan expected to be completed mid-2025. Then design, bid, award, and construct projects. Must be completed by Sept. 2026. 50 Update MS4 stormwater ordinance/permit for compliance. Public Works Director On Feb. 10, 2025 work session for presentation, Feb. 18, 2025 for first reading, March 10, 2025 for further review, and approved during March 18, 2025 regular session. Completed. 51 Improve/stabilize/realign N. Jackson St. in front of city hall, $55,000 for engineering costs. Construction is estimated to cost $440,000. Public Works Director / Project Manager Gresham Smith Engineers has conducted geotechnical analysis, preliminary design plans, and construction cost estimates. In FY 2025-26 budget to construct. 52 Prepare an agreement between the city and Humane Society detailing each party’s responsibilities in the new animal shelter. Public Works Director / Project Manager Agreement prepared. Discussed during Feb. 10, 2025 work session and Feb. 18, 2025 regular session. On March 10, 2025 work session and approved during March 18 regular session. Completed. 53 Complete the last 2,000 feet of sidewalk construction around MCHS. Public Works Director Expected completion during Summer 2025. 54 Improve the road and railroad intersection of W. Madison, Rocky Mount, and Old Riceville Road using Railroad Grade Crossing Program Grant, $600,000. Public Works Director Design completed. Project contract expected in June 2025. Moving to construction phase after October 1, 2025. 105