2022 08 16 City Council
City Council · packet · 137 pages · Descriptive metadata inferred from filename
Extracted text for page 95
Unverified text extraction. Check the original page for numbers, names, and layout.
• A1.3 – Floor plan showing renovations under the bid alternate which include construction of the MRHS Spay & Neuter Clinic which, if elected to be funded by MRHS, would allow them to relocate and operate their clinic seamlessly alongside the shelter • A2.2 – Floor plan showing renovations under the base bid which include construction activity details specifically for specialty kennels to house nursing dogs & puppies as well as aggressive & sick animals that need to be separate d from the general shelter population for their safety and the safety of staff, visitors, and volunteers. There are also a few regular canine kennels in this warehouse area as well • A2.3 – Floor plan showing renovations under the base bid which include construction activity details for the kennel areas that will house canines. There are two distinctive types of kennels, indoor -outdoor kennels, and smaller indoor kennels for smaller dogs . All kennels will afford animals climate-controlled shelter that can be secured as needed. The indoor-outdoor kennels are equal in size, and all kennels are larger than the largest kennel at the current shelter facility • A5.1-5.2 – Exterior profiles of the facility showing how the facility will look . In order to manage project costs, extensive exterior renovations, such as sealing of the existing block with a vapor barrier, addition of insulation, and new exterior blocking are not within the scope of the project . This could be pursued in a future renovation project if desired. Renovations are primarily limited to repair of damaged block areas, repainting, and replacement of existing doors and awnings, and addition of signage denoting animal intakes, adoption center, and the spay & neuter clinic If Council agrees with the proposed layout and renovation scope as submitted, City Staff will proceed to soliciting bids. Any other remaining minor issues or revisions will be handled as addenda during the bid process and any interested bidders will be made aware of the changes. Do not hesitate to contact me with any questions you may have. 92