2022 08 16 City Council
City Council · packet · 137 pages · Descriptive metadata inferred from filename
Extracted text for page 94
Unverified text extraction. Check the original page for numbers, names, and layout.
PUBLIC WORKS MEMORANDUM TO: C. Seth Sumner, City Manager FROM: Ben Burchfield, Public Works Director DATE: August 10, 2022 SUBJECT: Council Approval of Layout & Scope of Proposed Animal Shelter Facility After extensive work by both the City & MRHS in reviewing and coordinating with Allen & Hoshall on critical design elements of the new shelter, we have finally received a set of plans that details the layout of the facility as it is to be constructed. Staff is still working to make minor adjustments and clean up the plans to minimize clerical errors and eliminate conflicting or unconcise sheets or details that impact bidding. The expectation is to complete this over the course of the next week. The Public Works Department is requesting Council approval of the proposed layout & scope of the proposed animal shelter facility based on the plan documents provided. Staff would recommend Council direct particular attention to the following sheets to best understand what is being pursued for construction: • C1.1 which details what improvements are being performed to the site, generally, such as exterior outdoor runs, pathways, and parking lot adjustments required in order to make the facility fully ADA accessible • AD1.1-1.2 – Floor plan showing renovations under the base bid & alternate bid which include demolition activities that will remove existing structures and facilities in the building currently that must be addressed in order to accommodate the proposed use as a shelter and clinic and ensure the facility is fully ADA compliant • A1.2 – Floor plan showing renovations under the base bid which include construction activities related to building of shelter intake, animal housing, and adoption center 91