2022 08 16 City Council
City Council · packet · 137 pages · Descriptive metadata inferred from filename
Extracted text for page 23
Unverified text extraction. Check the original page for numbers, names, and layout.
Alternate 1, relative to the concrete that has se ttled around the monument , should be accepted and fixed for safety reasons. This is a settling issue from the old building and will continue to be a n issue if it is not addressed. Alternate 2, the pre-cast concrete cap to address the wall around the basketball court and Alternative 3, the poured-in-place bench, should be accepted if it is the intent to preserve the wall as part of the school history. I recommend these as the best options for dressing up the area without disturbing the wall. I do not recommend accepting Alternate 4 , trees , and shrubs, as that can be handled in phases through the general budget or perhaps a community project. I do not recommend accepting Alternative 5, replacement of the entire roof, unle ss some unknown structural issue necessitates the same. This was included in the event there was not a n adequate color match. I recommend using the old roof and if after fading it does not match, look into repainting the entire roof. It should be noted that there will be a color difference from new to old as all colors fade. I have included the building elevations as part of this memorandum and stand prepared to answer any questions relative to this bid or these plans. 20