Item C – Combined Lump Sum of Improvements plus Kitchen - $760,492 
 
Item D – Contingency (5% of lump sum total) – $38,024.60 
 
Item F – Total Base Bid Lump Sum - $798,516.60 
 
Alternate 1 - $13,434 
 
Includes removal of unlevel concrete around the monuments that is a trip hazard. The concre te is not 
cracked but has settled leaving it very unlevel and raised edges. This will remove  concrete walks and 
replace only the areas that abut the sidewalks. Some areas will be removed permanently  to eliminate 
the continued settling. This is a structural and cosmetic fix.  
 
Alternate 2 - $14,400 
 
Includes a pre -cast concrete cap for the wall around the basketball court. It was our desire to retain 
the last piece of the school building and it was determin ed that this cap was the best way to repair 
the top.  
 
Alternate 3 - $4,750 
 
Includes a poured-in-place bench on the west side of the  basketball court wall. This bench was 
deemed to be the best way to cover the exposed brick without compromising the structural integrity 
of the school wall.  A bench will be poured that covers the  unsightly area of the wall. This and 
Alternate 2 comprise the wall repairs discussed.  
 
Alternate 4 - $87,000 
 
Includes the entirety of the landscaping plan for the property. 
 
Alternate 5 - $42,000 
 
Includes the r eplacement of the entire roof . This price was asked for in case it was determined that 
the roof addition caused by the kitchen did not match. 
 
 
Recommendations: 
 
The items in the site improvements, (Item A), are necessary to finish the playground surfacing at Cook 
and Regional and include ADA improvements at Cook along with drainage  corrections that have been 
discussed. As this was the original capital item and is keep ing the Cook playground from opening, I 
recommend we do Item A. 
 
The kitchen, (Item B) was discussed by C ouncil as a  suggested improvement to Cook Park.   The 
architect and I also looked at a free -standing building but determined the best option was to add to 
the end of the  existing pavilion.  I present this configuration and bid as the best current option for 
adding a kitchen equivalent to Cook Park if the Council wishes to proceed with this item.  
 