Item C – Combined Lump Sum of Improvements plus Kitchen - $760,492 Item D – Contingency (5% of lump sum total) – $38,024.60 Item F – Total Base Bid Lump Sum - $798,516.60 Alternate 1 - $13,434 Includes removal of unlevel concrete around the monuments that is a trip hazard. The concre te is not cracked but has settled leaving it very unlevel and raised edges. This will remove concrete walks and replace only the areas that abut the sidewalks. Some areas will be removed permanently to eliminate the continued settling. This is a structural and cosmetic fix. Alternate 2 - $14,400 Includes a pre -cast concrete cap for the wall around the basketball court. It was our desire to retain the last piece of the school building and it was determin ed that this cap was the best way to repair the top. Alternate 3 - $4,750 Includes a poured-in-place bench on the west side of the basketball court wall. This bench was deemed to be the best way to cover the exposed brick without compromising the structural integrity of the school wall. A bench will be poured that covers the unsightly area of the wall. This and Alternate 2 comprise the wall repairs discussed. Alternate 4 - $87,000 Includes the entirety of the landscaping plan for the property. Alternate 5 - $42,000 Includes the r eplacement of the entire roof . This price was asked for in case it was determined that the roof addition caused by the kitchen did not match. Recommendations: The items in the site improvements, (Item A), are necessary to finish the playground surfacing at Cook and Regional and include ADA improvements at Cook along with drainage corrections that have been discussed. As this was the original capital item and is keep ing the Cook playground from opening, I recommend we do Item A. The kitchen, (Item B) was discussed by C ouncil as a suggested improvement to Cook Park. The architect and I also looked at a free -standing building but determined the best option was to add to the end of the existing pavilion. I present this configuration and bid as the best current option for adding a kitchen equivalent to Cook Park if the Council wishes to proceed with this item. 19