BASELINE SPORTS CONSTRUCTION www.baselinellc.com Proposed Project Timelines 1. 2. Option 1 — Demolition & reconstruction: 90 to 100 days Option 2 — Crack treatment & resurfacing 14 to 21 days Notes, Terms & Conditions: 1. 2. oy 6. 7. 8. Assumes construction will take place summer / fall 2023 Assumes unencumbered access to adequate material staging areas, access and haul routes and site location for the duration of our work scope detailed above. Pricing does not allow for the removal or replacement of unsuitable soils, unsuitable fill material, solid rock, hazardous materials or any other items that are not suitable to support our work scope. Assumes construction process will continue without interruption until our work scope is complete In order to adhere to product specifications, the tennis surface must be applied in dry conditions with ambient temperatures of at least 50-degrees and rising for a period of no less than 20 days. Quote does not allow for work related to existing court lighting. Quote does not allow for the repair of underground utilities. Quote expires in 30 days Thanks for the opportunity and please feel free to call or email if you have any questions. Steve Clift / Vice President M — 423.593.8284 www.baselinellc.com ASBA CERTIFIED TENNIS COURT BUILDER ON STAFF MEMBER AMERICAN SPORTS BULLDERS ASSOCIATION 3600 Henson Road, Knoxville, TN 37921 (800) 205-9521 (865) 588-4320 fax: (865) 588-4111 Email: info@baselineLLC.com 47