Unlocated infrastructure spending

Athens, Tennessee · Updated 2026-09-23 · Map covers FY2023–FY2028

Open current heat map · Full investment inventory · Maintained source register

$72,210,047.38 is now mapped, including $5,439,017.69 in paving. These are planned and reported investments, not a complete total of city spending.

What remains outside the map

The items below cannot be added into a single unlocated total: they mix unmatched locations, overlapping funding, reserves and projects outside the displayed years. An amount without a street match is not zero spending.

Connections now reflected in the map

The nine-street STBG resurfacing program is mapped, including its FY2023–FY2025 amounts previously listed as unlocated. The corrected older contract of $1,145,611.48 remains unmatched and is a different program.

Named stormwater projects, planned sidewalk corridors, park improvements, traffic projects, public buildings, and the Eureka/Prof Powers and Regional Park trail projects now have representative map allocations. Their project totals do not automatically reconcile every annual supplies, maintenance or professional-services account.

FY2021 and FY2022 were removed from the map controls because they have no matched locations; their source evidence is retained here. No amounts were reassigned to later years merely to display them.

Earlier account-level documentation

Historical FY2021–FY2025 account baseline and original PDF page links. Preserved for traceability; its former $1,079,357.31 unlocated headline is superseded and must not be used as the current gap total. Historical stormwater and sidewalk accounts still require reconciliation with the mapped project envelopes.